Introduction to Concrete fence wall cap machine:
Concrete fence wall cap machines use cement, stone, sand and etc as raw materials. Cement bondary wall cap and the H-shape Fence post by concrete column machine, not only can prevent rainwater into the inner parts of the boundary wall board, extend the life of the wall panel, but also play the role of beautifying decoration, at the same time, Fence wall installation is convenient and fast, saving labor costs, shorten projects constrution time.
Related machines and parts:
Raw materials | Concrete batching machine | mixer machine | dumping feeder | steel tension machine | concrete wall cap machines |
How to produce Precast Concrete fence post:
The process flow is similar with the production of fence post .
- Beore production,
- Please prepare raw materials and steel wire in advance.
- then clean production bed,Painting parting agent and Distribute the steel wire.
- After that, the production can start.
- During production,
- Firstly, Concrete batching machine start sand stone cement assignment proportion procedure .
- After that materials can go into mixer machine to complete mixing.
- Next, mixture materials will drop into feeding dumper from the mixer discharge port.
- After that, feeding dumper will transport the materials to concrete wall cap production bed. There, dump materials into the hopper of concrete wall cap machine.
- After that, concrete wall cap machine will start to work along the rail.
- Finally,concrete wall cap can come out, also the cutting machine can do cutting 24 hour later.
- About Curing conditions after production,
-For the temperature above 30 degrees,Please cover the concrete wall cap surface with plastic film, blanket, straw curtain, etc. to keep moisture , in this way, it can prevent the water from volatilizing too fast, causing concrete wall cap to appear cracking cracks.Besides,spray water for timely curing.
-For temperatures below 25 degrees,Put the concrete wall cap in the open air, no need to cover to keep moisture. Besides,spray water into the concrete wall cap surface to maintain moisture after demolding about 2-5 hours .
-When the temperature is about zero degrees,Please cover the concrete wall cap surface for heat preservation and moisture retention, no need to spray water curing.
-For below zero, better stopping production.
-For The temperaturer is higher than about 25 degrees, Move concrete wall cap within 2-3 days after production.